Noise from the tunnel work at Vilhelm Meyers Allé

Aarhus Letbane (the Aarhus light rail) will commence installing the sheet piles for an elevator shaft in the tunnel from Monday 26 January through 3 February.

Currently, the construction of the two tunnels on Nørrebrogade is at a standstill, but the light rail construction crew is still working on the construction of an elevator shaft in the existing tunnel at Vilhelm Meyers Allé. This involves driving large iron plates (sheet piles) into the ground, which may cause a noise nuisance for students and staff at Aarhus University. The installation of the sheet piles with vibratory hammers will take place between 06.00 and 19.00.

Read more about the light rail at www.letbanen.dk (in Danish)

Enquiries about the construction work can be sent to info@aarhusletbane.dk